ProjectGlenwood Transmission Pipeline Replacement - Fire Flow Improvement Program 
ProgramA2A Fire Flow Improvement Program 
Project NumberF22002
ContactBryan Cook | bryan.cook@marinwater.org 
Image
Map of pipeline locations off Point San Pedro Rd near Wildcat Lagoon and San Pedro Lagoon
Image
An intersection in a residential area

Project Description 

This project includes the installation of approximately 6,470 feet of 18-inch, 16-inch, 12-inch, 8-inch, 6-inch and 4-inch welded steel pipe with valves, fittings, pipe disinfection and appurtenances. The work to be done is located in the City of San Rafael. 

Benefits

The benefit of this project is to replace old 1954 cast iron pipe with new 12-inch welded steel pipe to improve fire flow and seismic resiliency of the system. 

Schedule and Status

Design: Fall 2022 - Spring 2025

Construction: Summer 2025 - Winter 2026

 

Funding Sources 

Capital Maintenance Fund 
Fire Flow Improvement Program Fund
Total
-
$3,890,000