Get started here to install a new water service or modify an existing one
When initiating a construction project, there may be a variety of requirements related to water service that must be undertaken as part of your project. These requirements are established and administered by Marin Water. Projects may include:
- New construction
- Renovations requiring installation of a fire sprinkler system
- Renovations adding water fixtures beyond existing meter capacity
- Accessory dwelling units (ADUs)
- Dedicated irrigation meters
- Relocating an existing water meter
Marin Water’s Engineering Development Services team can assist you with information regarding the installation of new or upgraded water meters, dedicated fire line connections or water main extensions.
To get an early idea of potential requirements for your project, refer to the overview of new water service requirements.
When you are ready to proceed with the water service installation or modification process, complete the Project Information Form.
What to expect after submitting your Project Information Form
Your project information will be reviewed by Marin Water staff within 10-14 business days. Marin Water will then provide all requirements, fees and forms for your project. For a step-by-step guide to the water service application process, please refer to the Water Service Checklist.
Fees and Costs
Fees & Charges
The fees and charges associated with new or upgraded water service may include the following:
- Service installation fee
- Meter installation fee
- Meter relocation fee
- Inspection charges
- Capacity charges
Please refer to the Schedule of Rates, Fees and Charges for the current time period to review fees and charges.
- Schedule of Rates, Fees and Charges effective July 1, 2025 – June 30, 2026
- Schedule of Rates, Fees and Charges effective July 1, 2026 – June 30, 2027
Additional Potential Costs to the Customer
In addition to the fees, a customer may incur other costs when installing a new water service or when increasing the size of an existing water meter.
- Installation of a backflow prevention assembly: Costs associated with purchasing/installing required backflow prevention assembly.
- Landscape plan review: Costs associated with hiring a landscape architect to prepare and submit materials to comply with the landscape plan review process.
- Installation of high-efficiency water-using fixtures: Costs to ensure fixtures (i.e., toilets, urinals, dishwashers, etc.) meet water conservation standards.
For questions, please call our Engineering Development Services department between 8 a.m. to 4 p.m., Monday through Friday at 415.945.1530.
Resources:
- Overview of water service requirements
- Standard Details of the District
- Standard Specifications for Private Contracts
- Water Service Checklist
- Fees and charges:
- Schedule of Rates, Fees and Charges
(effective through June 30, 2026) - Schedule of Rates, Fees and Charges
(effective July 1, 2026 – June 30, 2027) - Review the District’s 2025 Water Capacity Charge Study
- Schedule of Rates, Fees and Charges
- Landscape plan review process
- Backflow prevention
- Indoor efficiency standards
- ADU flowchart